I had intended to paddle from Langham Farm to Iford tomorrow but after doing a recce today it looks as though we would be better off avoiding Iford weir for the time being. Since our last trip work has started on a small scale hydro scheme at this weir. From the pictures you will notice the raised crest of the weir, the fish pass at the far side (I wonder if it's wide enough for a canoe to pass), and the reinforced concrete structure which will contain the Screw. Note the flexible pipe draped across the river downstream of the weir.